1 JW SHORT CALL. 8pm start (3rd shift). Start date is 9/10/25. Contractor is Los Angeles Electric. Job site is Kaiser Riverside. I-9 docs and CA State cert required.
Related Posts
March 6, 2026
March 6, 2026
1 UNFILLED JW LONG CALL
-1 JW long call. Report on Monday, 3/9. 6:30a start. Contractor is Baker Electric. Job…
February 18, 2026
ALL JW CALLS HAVE BEEN FILLED – 2/18/26
All JW calls have been filled.
February 9, 2026